do not plan to remove r1 until sprint s/POS/Ether/
This commit is contained in:
parent
d074037fe0
commit
565409a839
1 changed files with 4 additions and 2 deletions
|
|
@ -22,8 +22,10 @@ CURRENT CONTACTS LIST: (2022-05-13)
|
||||||
* Remove akkht.hactrn.net
|
* Remove akkht.hactrn.net
|
||||||
* Remove cypress.shrubbery.net
|
* Remove cypress.shrubbery.net
|
||||||
* Repurpose serial o0.11 to Cisco ASR r2.iad.rg.net craft port
|
* Repurpose serial o0.11 to Cisco ASR r2.iad.rg.net craft port
|
||||||
* Move r2.iad.rg.net MGT ether to an empty port on sw0.iad
|
* Connect an r2.iad ether to an sw0.iad LAN port, maybe GigabitEthernet1/0/3
|
||||||
* Connect r0.iad to ASR r2.iad to MPLS tunnel Sprint POS to GigE
|
* Connect r2.iad MGT ether to sw0.iad, maybe GigabitEthernet1/0/11
|
||||||
|
* Connect an r0.iad ether to ASR an r2.iad ether
|
||||||
|
* Build an MPLS tunnel from Sprint POS on r1 to a GigE on r2
|
||||||
* Configure r2.iad for Sprint, LAN, ...
|
* Configure r2.iad for Sprint, LAN, ...
|
||||||
|
|
||||||
## Rack Physical and Wiring
|
## Rack Physical and Wiring
|
||||||
|
|
|
||||||
Loading…
Add table
Add a link
Reference in a new issue