caught some errors when doing the wiring spreadsheet for moving
the rack
This commit is contained in:
parent
8eb6fc88ca
commit
05d9ad36b8
1 changed files with 7 additions and 1 deletions
|
|
@ -67,7 +67,8 @@ Sprint.19FMMR.RR.604.5.A5 (9/10)
|
||||||
|
|
||||||
* mike and shaun, the hands on folk from our westin colo, are willing
|
* mike and shaun, the hands on folk from our westin colo, are willing
|
||||||
to do the heavy lifting of the move if we can schedule it for a
|
to do the heavy lifting of the move if we can schedule it for a
|
||||||
weekend. 15th or 22nd of april.
|
weekend. 15th or 22nd of april. Looks like the 22nd is more
|
||||||
|
viable.
|
||||||
|
|
||||||
* it may take a month or to to get the fiber back to NTT in the westin.
|
* it may take a month or to to get the fiber back to NTT in the westin.
|
||||||
|
|
||||||
|
|
@ -75,6 +76,11 @@ Sprint.19FMMR.RR.604.5.A5 (9/10)
|
||||||
is giving us transit across the SIX. so we will have transit and
|
is giving us transit across the SIX. so we will have transit and
|
||||||
peering on the move.
|
peering on the move.
|
||||||
|
|
||||||
|
* It's really three cross-connects to the SIX
|
||||||
|
* 10G to r2
|
||||||
|
* 1G to r1
|
||||||
|
* 1G to USC/Columbia [PEERING testbed](https://peering.ee.columbia.edu/)
|
||||||
|
|
||||||
* we may be able to get vertical power bars from evocative, the new
|
* we may be able to get vertical power bars from evocative, the new
|
||||||
colo folk. they have a ton stashed under the raised floor in santa
|
colo folk. they have a ton stashed under the raised floor in santa
|
||||||
clara, and seem willing to give us enough for the rack. i am trying
|
clara, and seem willing to give us enough for the rack. i am trying
|
||||||
|
|
|
||||||