caught some errors when doing the wiring spreadsheet for moving

the rack
This commit is contained in:
Randy Bush 2023-04-10 11:55:28 -07:00
parent 8eb6fc88ca
commit 05d9ad36b8

View file

@ -67,7 +67,8 @@ Sprint.19FMMR.RR.604.5.A5 (9/10)
* mike and shaun, the hands on folk from our westin colo, are willing * mike and shaun, the hands on folk from our westin colo, are willing
to do the heavy lifting of the move if we can schedule it for a to do the heavy lifting of the move if we can schedule it for a
weekend. 15th or 22nd of april. weekend. 15th or 22nd of april. Looks like the 22nd is more
viable.
* it may take a month or to to get the fiber back to NTT in the westin. * it may take a month or to to get the fiber back to NTT in the westin.
@ -75,6 +76,11 @@ Sprint.19FMMR.RR.604.5.A5 (9/10)
is giving us transit across the SIX. so we will have transit and is giving us transit across the SIX. so we will have transit and
peering on the move. peering on the move.
* It's really three cross-connects to the SIX
* 10G to r2
* 1G to r1
* 1G to USC/Columbia [PEERING testbed](https://peering.ee.columbia.edu/)
* we may be able to get vertical power bars from evocative, the new * we may be able to get vertical power bars from evocative, the new
colo folk. they have a ton stashed under the raised floor in santa colo folk. they have a ton stashed under the raised floor in santa
clara, and seem willing to give us enough for the rack. i am trying clara, and seem willing to give us enough for the rack. i am trying